accepted

    Rebuild proportionate risk-based CI/CD

    Accepted and implementation started 2026-09-07. The operator instructed implementation of this plan. The change classifier, test inventory, five critical browser journeys, reusable exact-artifact release workflow, scheduled broad assurance workflow and 500 MB artefact ceiling are now in the repository. The ADR remains accepted—not implemented—until the ten-release observation period satisfies the confirmation criteria below.

    Context and Problem Statement

    OPDA publishes a mostly static public information, participation and technical documentation website. Its release workflow has accumulated unit contracts, generated-file drift checks, a whole-site route and resource crawl, Chromium installation, browser interaction tests, accessibility scans, responsive checks and visual snapshots. Many checks are valuable, but too many run as mandatory publication gates for every presentation or content change.

    The 7 September 2026 failed release provides a measured baseline. Contracts passed in 25 seconds. The static build took 2 minutes 54 seconds, the route and resource crawl took 7 minutes 45 seconds, and the browser suite ran for 12 minutes before failing. Deployment never started. The same commit subsequently built and deployed through the audited break-glass path in 5 minutes 44 seconds, including 2 minutes 44 seconds to synchronise the 3.4 GB dist/ tree.

    The present system confuses broad verification with release safety. Exact prose, CSS structure, screenshots and every generated route can block publication even when the changed surface does not affect them. Repeated attempts multiply a roughly 24-minute feedback cycle into an hour of delivery work. This contradicts ADR-0040’s accepted requirement for deterministic, proportionate releases.

    ADR-0040 is accepted and implemented as the current AWS/OIDC deployment architecture. This proposal retains that architecture. ADR-0073 is implemented, but its statement that the complete 139-test browser matrix is a release gate is no longer proportionate; acceptance of this proposal will amend that boundary.

    Decision Drivers

    • Keep production credentials short-lived and deployment auditable.
    • Preserve strong validation for ontology, schema, authentication, forms and infrastructure when those surfaces change.
    • Publish routine editorial and presentation changes within minutes.
    • Make failures local to the changed surface and straightforward to diagnose.
    • Test behaviour and user outcomes rather than incidental wording or markup.
    • Build a release candidate once and deploy that exact artefact.
    • Keep comprehensive assurance available without making every check synchronous.

    Considered Options

    • Keep the current universal gate. Simple policy, but slow, brittle and demonstrably disproportionate for routine site work.
    • Remove most automated testing. Fast, but discards valuable evidence and weakens high-risk model and operational changes.
    • Use risk-based lanes with scheduled broad assurance (chosen). Select gates deterministically from changed paths, retain a small common release core and move exhaustive sweeps out of the publication critical path.
    • Deploy every push immediately and test afterwards. Fastest, but permits known broken builds to reach production and makes rollback routine.

    Decision Outcome

    Adopt a change-aware pipeline with four validation lanes and one scheduled assurance workflow. A deterministic classifier owns lane selection; tests do not infer their own importance at runtime.

    Lane 1 — editorial and presentation

    Applies to prose, images, non-interactive styles and page composition. Required checks are dependency installation, the static build, generated-design manifest consistency, changed-route link validation and a maximum of five critical browser smokes covering the homepage, navigation, join page, search and one technical document. Exact copy, DOM nesting and broad screenshot baselines are not gates.

    Target: production publication at p95 within 8 minutes of a main push.

    Lane 2 — application behaviour

    Applies to shared components, client scripts, authentication, search, forms and serverless handlers. It adds focused unit/contract tests and browser journeys mapped to the affected component. Security-sensitive boundaries retain negative tests. Unrelated route families and visual snapshots do not run.

    Target: pull-request feedback at p95 within 10 minutes.

    Lane 3 — ontology and generated data

    Applies to ontology sources, generator code, schemas, mappings and committed projections. It retains Jena/SHACL validation, generator tests, BASPI5 round-trip, schema reproducibility, byte identity and generated-model drift. It builds the site once after those checks and then runs the small critical browser smoke.

    Target: complete evidence rather than editorial-lane speed, with p95 below 25 minutes and no duplicated model generation.

    Lane 4 — infrastructure and deployment

    Applies to CloudFormation, IAM, AWS workflows and runtime service definitions. It validates templates and security boundaries independently of the site browser suite. Site content tests cannot block an infrastructure-only change unless the change modifies the hosting contract used by the site.

    Scheduled assurance

    A nightly workflow runs the complete route/resource crawl, broad WCAG sampling, all supported viewport checks and a small, curated visual-baseline set. External link checks run weekly because they depend on third parties. Failures create a tracked issue or alert and block promotion of the affected test to a release gate until it is stable; they do not retroactively redefine a deployed release.

    Test policy

    Every existing test is assigned exactly one owner and one tier:

    1. release blocking — protects a user-visible critical journey or system boundary;
    2. pull-request blocking — focused evidence for the changed component;
    3. scheduled assurance — broad, slow or externally variable inspection;
    4. development aid — useful locally but not authoritative; or
    5. delete — duplicates another test or asserts incidental implementation detail.

    Tests must assert stable behaviour. Assertions over exact editorial prose, unimportant CSS declarations, generated page counts and large page screenshots are removed or narrowed unless the value is itself a governed contract. A flaky test is moved out of the release tier immediately; retries may collect evidence but may not disguise instability.

    Artefact and deployment policy

    The selected lane produces one immutable dist/ artefact with the source commit recorded in its manifest. Deployment downloads that artefact, assumes the existing OIDC role, synchronises S3 and invalidates CloudFront. It never rebuilds. The break-glass workflow remains available for an explicitly confirmed, auditable release when the normal classifier or gate is defective.

    The 3.4 GB output is investigated separately. Large source renderings and media that do not need to ship with every release move to versioned resource storage; images receive responsive derivatives. The target is a routine site artefact below 500 MB without deleting public resources or breaking stable URLs.

    Migration Plan

    1. Baseline and classify (one day). Record median and p95 duration, failure rate and artefact size for recent runs. Inventory every test and assign its owner, tier, protected behaviour and relevant path set.
    2. Create the fast lane (two days). Extract build-and-deploy into a reusable workflow, implement the deterministic change classifier and replace the full browser gate with the five critical smokes for editorial changes.
    3. Split focused suites (two to four days). Divide the monolithic Node and Playwright commands by component and risk. Remove duplicate and incidental assertions. Keep ontology and infrastructure suites independently callable.
    4. Move breadth off the critical path (one day). Add nightly and weekly assurance schedules with retained artefacts and issue/alert reporting.
    5. Reduce the release artefact (two to four days). Produce a size report, move heavyweight archives behind stable resource URLs and add responsive image generation and cache-friendly immutable names.
    6. Observe for two weeks. Compare timings, false failures, escaped defects and break-glass use. Promote a scheduled test only with evidence that it is stable, material and cheaper than the failure it prevents.
    7. Retire the old graph. Delete obsolete workflow paths and update ADR-0040, ADR-0073, README commands and branch-protection checks to the implemented names. Mark this ADR implemented only after the confirmation criteria pass.

    Consequences

    • Good, because routine website releases should approach the measured 5–6 minute build-and-deploy time rather than the current 24-minute failed-gate cycle.
    • Good, because ontology and operational risks keep their specialised evidence.
    • Good, because failures identify the affected surface instead of presenting a large unrelated browser report.
    • Good, because broad accessibility and route assurance remains automated.
    • Bad, because the path classifier becomes release-critical code and needs small, explicit tests of its own.
    • Bad, because scheduled failures require ownership and triage rather than simply blocking every release.
    • Neutral, because break-glass deployment remains possible and auditable; this proposal aims to make its use exceptional again.

    Confirmation

    Implementation is complete only when all of the following are demonstrated over at least ten ordinary releases:

    • Local implementation evidence on 7 September 2026: all 251 Node contracts passed; a clean static build completed in about 20 seconds; the whole-site crawl completed in about 28 seconds with zero broken or orphaned routes; and the release artefact measured 362.3 MiB across 5,281 files.

    • editorial-lane p95 publication time is 8 minutes or less;

    • application-lane p95 feedback time is 10 minutes or less;

    • no release candidate is built more than once;

    • every test has an owner and tier, with zero unclassified release tests;

    • routine releases contain no whole-site crawl or broad screenshot gate;

    • ontology-input changes still execute all model and reproducibility evidence;

    • the deployed commit and artefact identity are visible in the run record;

    • the ordinary release artefact is below 500 MB, or a documented exception names the retained large resources and their owner; and

    • no escaped severity-one or severity-two defect is attributable to a removed gate during the observation period.

    Rollback is one workflow-file revert: restore the prior universal dependency graph while retaining the break-glass path. AWS hosting, OIDC trust, S3 exclusions and CloudFront invalidation are unchanged by this proposal.

    More Information

    • ADR-0040 defines AWS hosting, GitHub OIDC and exact-artefact deployment.
    • ADR-0073 defines the current design-system and browser-test boundary that this proposal narrows.
    • Release evidence: GitHub Actions run 34102667225 failed after approximately 24 minutes; break-glass run 34105283581 deployed commit 1a38bcbb in 5 minutes 44 seconds on 7 September 2026.